
Case Studies: » Retail » Windsor Shopping Centre - Planned Maintenance
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| London | Planned maintenance works at Windsor shoppping centre | 8 Weeks |
| Scope of Work: | Pictures: |
| - Repainting of windows to the old station masters house (listed building) - Replacement of damaged glazing panels to the glass canopy over the centre - Painting of canopy supports within the centre - Replacement of pigeon netting within the external archway - Fitting of solar reflective film to the outside of the glass canopy above the Ha Ha bar - Removal and then replacement of Triflex to the ramped walkway to the rear of the complex - Masonry and stone repairs to the fabric of the station masters house - Replacement of coping stones to cure leaking roof - Cleaning and minor repairs to the stained glass roof light within the old waiting room - Replacement of metal roof sections over centre in line with English Heritage recommendations and subsequent painting |
12 (See Below) |
| Windsor Shopping Centre - Planned Maintenance (12 Pictures): | Click arrows to scroll. Click images for full size picture preview: |