Case Studies: » Retail » Three Horseshoes Shopping Mall - residential accomodation refurb
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| Warminster | Refurbishment of 8 flats above operating shopping centre | 12 Weeks |
| Scope of Work: | Pictures: |
| - Strip out of all floor coverings, fixtures, fittings, kitchen fittings, sanitary ware and removal of furniture - Making good of all surfaces and full redecoration - New windows and doors (UPVC framed double glazed components) - Installation of new kitchen fittings and appliances and bathroom suites - Supply and fit all new floor coverings - All electrical works including installation of storage heaters and extractor fans |
4 (See Below) |
| Three Horseshoes Shopping Mall - residential accomodation refurb (4 Pictures): | Click arrows to scroll. Click images for full size picture preview: |