
Case Studies: » Retail » Kingfisher Shopping Centre - Office Refurb
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| Redditch | Refurbishment to offices, toilets, kitchen within shopping centre | 5 Weeks |
| Scope of Work: | Pictures: |
| Strip out of offices New suspended ceiling Decorations Electrical and Mechanical Floor coverings Joinery Kitchen and toilet works |
6 (See Below) |
| Kingfisher Shopping Centre - Office Refurb (6 Pictures): | Click arrows to scroll. Click images for full size picture preview: |