Case Studies: » Industrial » Perivale - Warehouse Refurb
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| Perivale London | Industrial warehouse refurbishment | 12 Weeks |
| Scope of Work: | Pictures: |
| New drains, new aco kerbs and pathways Excavation and removal of an underground diesel tank New hard standing Removal of trees Lining Roof repairs and new flat roof Unifold guttering system Installation of new cladding and trims Spraying of cladding New Roller shutter doors and folding door External hardstanding, including concrete and tarmac Structural changes to rear elevation and installation of associated steelwork |
13 (See Below) |
| Perivale - Warehouse Refurb (13 Pictures): | Click arrows to scroll. Click images for full size picture preview: |