Case Studies: » Industrial » Dunstable, Woodside - Refurb of industrial unit
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| Dunstable | Refurbishment of industrial unit | 7 Months |
| Scope of Work: | Pictures: |
| Alteration and refurbishment of an existing industrial warehouse and office. Works to include: demolition of remaining elevations and steelwork, redecoration, replacement of roof coverings and wall cladding, external works and drainage, replacement of external windows and personnel/loading doors the construction of mezzanine offices and fit out including new mechanical and electrical installations. Creation of new car park areas inc CCTV bases and floodlights. The areas calculated were Ground Floor 2497m sq / 26,872ft sq and First Floor Offices 439m sq. / 4,724ft sq. |
17 (See Below) |
| Dunstable, Woodside - Refurb of industrial unit (17 Pictures): | Click arrows to scroll. Click images for full size picture preview: |