Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| Cambridge | Refubishment of ground floor and first floor offices | 4 Months |
| Scope of Work: | Pictures: |
| Strip out of all fixtures and fittings to ground and first floor offices, kitchens and toilets and form new open plan office with kitchen and toilet facilities (including disabled toilet facilities on the ground floor). - Offices – new suspended Ceiling, lighting, air conditioning, skirting trunking, floor coverings and decorations - Kitchen – Installation of new kitchen, new ceiling, ventilation, non-slip floor covering and decorations - Toilets – Install new IPS panel system, cubicles, vanity top, inset sinks, sanitaryware, non-slip safety vinyl flooring and decorations - Disabled toilet - Construct new partition to form disabled facility, install Doc M Compliant toilet, sink and hand rails, new suspended ceiling, ventilation, lighting, hand dryer and disabled alarm |
6 (See Below) |
| Hills Road (6 Pictures): | Click arrows to scroll. Click images for full size picture preview: |