
Case Studies: » Commercial » Henrietta Street - Office and Reception Area Refurb
Information about this case study is shown below. If you have any questions, please contact us:| Location: | Summary: | Duration: |
| London | Refurbishment to offices and reception, in an occupied building | 3 Weeks |
| Scope of Work: | Pictures: |
| Strip out of offices Rectification works to metal ceiling grid Decorations Floor coverings Electrical and Mechanical Stonework restoration Glazing Blinds Access Floor |
7 (See Below) |
| Henrietta Street - Office and Reception Area Refurb (7 Pictures): | Click arrows to scroll. Click images for full size picture preview: |